Reactions to preliminary 35W bridge design

Grants | Legacy Digitization | Topics | Politics | Special Collections | 35W Bridge Collapse |
Listen: 7061544
0:00

The public will have a chance to weigh in on the preliminary bridge design at hearings this week. But some think this is too late to have a real impact on what the bridge will look like, or to make changes such as where the light rail line will be.

Funders

Digitization made possible by the State of Minnesota Legacy Amendment’s Arts and Cultural Heritage Fund, approved by voters in 2008.

This Story Appears in the Following Collections

Views and opinions expressed in the content do not represent the opinions of APMG. APMG is not responsible for objectionable content and language represented on the site. Please use the "Contact Us" button if you'd like to report a piece of content. Thank you.

Transcriptions provided are machine generated, and while APMG makes the best effort for accuracy, mistakes will happen. Please excuse these errors and use the "Contact Us" button if you'd like to report an error. Thank you.

< path d="M23.5-64c0 0.1 0 0.1 0 0.2 -0.1 0.1-0.1 0.1-0.2 0.1 -0.1 0.1-0.1 0.3-0.1 0.4 -0.2 0.1 0 0.2 0 0.3 0 0 0 0.1 0 0.2 0 0.1 0 0.3 0.1 0.4 0.1 0.2 0.3 0.4 0.4 0.5 0.2 0.1 0.4 0.6 0.6 0.6 0.2 0 0.4-0.1 0.5-0.1 0.2 0 0.4 0 0.6-0.1 0.2-0.1 0.1-0.3 0.3-0.5 0.1-0.1 0.3 0 0.4-0.1 0.2-0.1 0.3-0.3 0.4-0.5 0-0.1 0-0.1 0-0.2 0-0.1 0.1-0.2 0.1-0.3 0-0.1-0.1-0.1-0.1-0.2 0-0.1 0-0.2 0-0.3 0-0.2 0-0.4-0.1-0.5 -0.4-0.7-1.2-0.9-2-0.8 -0.2 0-0.3 0.1-0.4 0.2 -0.2 0.1-0.1 0.2-0.3 0.2 -0.1 0-0.2 0.1-0.2 0.2C23.5-64 23.5-64.1 23.5-64 23.5-64 23.5-64 23.5-64"/>